Manufacturing processes of high-precision small parts are regularly optimized, in order to obtain the best possible cost-benefit ratio from the production. Large quantities in short cycle times are the decisive basis for optimization of production processes.
When multiple parts can be produced in one clamping, a reduction of single piece time by 50% is ensured.
Through the use of a double diaphragm chuck, we have achieved exceptional results in the precision grinding of internal bores.
Our solution approach makes it possible to machine two work pieces simultaneously and to load and unload them in parallel through the diaphragm chuck. The unloading takes place on the side on which the internal machining occurs.
The following measures stood at the forefront here:
Customer: corporation company
Country: USA
Products: ULTRA ALPHA
Services: process design
Application: valve train, cam phaser
BTI BAHMÜLLER TECHNOLOIGES INC.
Phone: +01 704 587 3506
E-Mail: info@bahmueller-usa.com
Please find our contact persons for each country. Choose a county and a department. We look forward to hearing from you.
Simply contact us by a short message. We are looking forward for your message.