Logo Bahmüller

DOUBLE DIAPHRAGM CHUCK WITH SIMULTANEOUS LOADING (MIDDLE CLAMPING WSS)

Manufacturing processes of high-precision small parts are regularly optimized, in order to obtain the best possible cost-benefit ratio from the production. Large quantities in short cycle times are the decisive basis for optimization of production processes.

When multiple parts can be produced in one clamping, a reduction of single piece time by 50% is ensured.

Through the use of a double diaphragm chuck, we have achieved exceptional results in the precision grinding of internal bores.

Our solution approach makes it possible to machine two work pieces simultaneously and to load and unload them in parallel through the diaphragm chuck. The unloading takes place on the side on which the internal machining occurs.

YOUR BENEFITS

  • 50% reduced cycle time when processing 2 parts in 1 operation
  • precisely produce small parts in high quantities and short single cycle time
  • customer-focused process modification (workflow)

The following measures stood at the forefront here:


  • part clamping optimization
  • further development of existing clamping concepts
  • process-oriented modification of work piece process

PROJECT PROFILE

Customer: corporation company
Country: USA
Products: ULTRA ALPHA
Services: process design
Application: valve train, cam phaser

WE ARE LOOKING FORWARD FOR YOUR CALL


Our head office will be glad to advise you.

phone +49-(0)7181-809-0
fax +49-(0)7181-809-234
e-Mail info@bahmueller.de


You will find your personal contact on the different departments under the rubric service.

BAHMÜLLER YOUR CONTACT


Please find our contact persons for each country. Choose a county and a department. We look forward to hearing from you.

BAHMÜLLER Contacts

MESSAGE TO BAHMÜLLER


Simply contact us by a short message. We are looking forward for your message.

Your message to Bahmüller

Consent *